Skip to content
NewGot a product? Test it with real Nigerians on 9jatesters
RANKED

Buying guide

How to choose a reliable contractor in Nigeria

For a repair or a small build you are buying a diagnosis and the chance that someone comes back when it fails. Gather the evidence before you discuss the price.

Eruo Fredoline~5 minute read

The short answer

Get the evidence before you get the price. The shortest quote usually belongs to the person who has looked at the job least, and the cheapest quote is rarely the cheapest job once the second visit is counted.

For a repair or a small building project you are buying a diagnosis, materials, time, and the chance that somebody returns when a fix does not hold. Only one of those things is visible in a number over the phone.

Start with a specific job

"I need a plumber" is too broad to price. Write down the actual fault: a leaking underground pipe, a blocked drain, a bathroom to install from scratch, a pump that cuts out after ten minutes.

Send the same description and the same photos to at least two contractors. If each of them is quoting a different job, the prices cannot be compared with each other and the lowest one is not information.

Check the person before the promise

Use the listing for the phone number, the location and the review history. Then make the call and ask:

  • Do you handle this exact type of job?
  • What will you inspect before you quote?
  • Who will actually come to the site?
  • What happens if the first repair does not hold?
  • Which materials are included in the price?

The answers are the evidence. Someone who asks for photos, measurements or an inspection before quoting is often doing better work than someone who names a confident price without seeing the problem.

Read reviews for failure and recovery

Do not read only the five-star comments. Search the reviews for the thing you are trying to avoid: unfinished work, a price that moved after the job started, a missed appointment, a refusal to come back.

What the contractor did next matters as much as what went wrong. Someone who explains a delay and then finishes the work is giving you different evidence from someone who has never answered a complaint. Look for reviews spread across months rather than a cluster posted in one week.

Our ranking scores review volume and review recency separately for this reason, because an average on its own hides the difference between a contractor who improved and one who stopped trying. Read the review text before you call. How to read Nigerian online reviews goes through it line by line.

Verify the address and the contact path

Plenty of tradespeople work from a yard, a workshop or a shared compound rather than an office, and that on its own means nothing. What matters is that you can find them again and that you know who carries responsibility for the job.

Call the listed number. Ask for the landmark in the contractor's own words. If the number belongs to somebody else, or nobody can describe where the workshop is, slow down before any money moves.

For larger work, ask for a written quote carrying the business name, the scope, the materials, the labour, a start date and the payment stages. Keep the messages.

Keep the first payment small enough to survive

Do not pay for a whole job before materials arrive and work begins. A deposit can be reasonable for a custom order or a materials run. The size of it should match what has to be bought next, rather than the contractor's need for working capital.

Before you transfer, check the account name. If you are hiring a registered company and the account resolves to an unrelated personal name, ask why. An explanation that is urgent, vague, or that quietly changes the terms you already agreed is a reason to stop and check. The identity checks in how to check a Nigerian business is real before you pay apply here without modification.

Match the check to the job

For a small repair, a working phone number, a clear scope, a findable address and recent reviews with detail in them are enough to arrange an inspection.

For structural work, electrical installation, or anything that affects safety, ask for the licence, qualification, insurance or professional registration that the specific work requires. Which register applies depends on the trade. A badge on a directory is no substitute for the register itself.

For a contractor working inside your home, agree in writing who will be present, what happens to keys, and how the site gets left at the end of each day. Do it before the first visit, while you still have the leverage of not having paid.

Red flags worth acting on

  • The quote expires within the hour, and the price rises when you ask questions.
  • The payment account changes after you have agreed terms.
  • The scope stays verbal after you have asked for it in writing.
  • An inspection is refused while a large deposit is demanded.
  • The reviews describe the exact failure you are trying to prevent.
  • The phone number, the business name and the address do not point at the same business.

One of these can have an innocent explanation. Several of them on the same job is a reason to hire somebody else.

Use the ranking as a first screen

Start from the category and the city: plumbers in Lagos, electricians in Lagos, generator repairers in Lagos, or the same trade in your own city from the category index. Compare the evidence, then call a shortlist.

Order on those pages comes from the star rating, review volume, recency, profile completeness, review sentiment and verification, and never from payment. The weights are published at how we rank. The contractor still has to diagnose the fault, quote honestly and finish the work. A ranking can tell you who has earned a phone call. The job tells you whether they deserved it.

Who wrote this

Eruo Fredoline

Founder and Chief Executive, Ranked Technologies Limited

The data studies on this blog are queries against the directory he built. When a figure here says 259,317 listings, that is the table he can open, and the method note under each study says what it counted and what would distort it.

More about the author · Found something wrong? Report it and we will correct it, including in public where we published the wrong number.

More from the blog